I was in Wyoming and stopped by this project to get some pics and video. This was a really interesting project. Challenging soil conditions led to the whole project being built on piers. The interior is mostly done with access flooring. Then there are the radial Glulams that were clear-coated and used in the vaulted interior space. The building next to the new library is the old library and was included in the scope of the project and is currently being finished. The old library will serve as a conference hall.