Author Archives: STIMA

New Afton Administration Building

This provided full estimating services throughout design. Project required significant VE during the process. One of the significant issues was mechanical design. The design incorporated an air handling unit with fan coils for each office and a screw type chiller. … Continue reading

Posted in Commercial Construction | Comments Off on New Afton Administration Building

Exterior Remodel

This was a small exterior remodel where the owner was looking to self-perform and was looking for a material take-off and a separate estimate if items were to me subcontracted out.

Posted in Residential Construction | Comments Off on Exterior Remodel

New Dental Office

For this project, the client wanted the project priced as completely finished with deduct alternates if the upstairs offices were left unfinished and a separate deduct to leave 4 dental exam rooms unfinished.

Posted in Uncategorized | Comments Off on New Dental Office

Sundance Administration MCER Study

We were commissioned to provide estimates for four different options involving four different buildings.

Posted in Commercial Construction | Comments Off on Sundance Administration MCER Study

Residence

We provided a cost estimate for this home. After we provided our estimate for cost of construction, a builder gave them his estimate. His was almost 300K more that what we estimated… but the catch was that this couple had … Continue reading

Posted in Residential Construction | Comments Off on Residence

Office Expansion Feasibility Study

This project involved converting an existing bank into offices. Challenges included getting HVAC into the expanded building, Height differences between ceilings, and demolition of bearing walls.  

Posted in Commercial Construction | Comments Off on Office Expansion Feasibility Study

Torrington High Remodel

This was a small project involving the ticketing area and gym of a high school. Highest dollar value aspect was the new bleachers that were being added.

Posted in Commercial Construction | Comments Off on Torrington High Remodel

Lincoln Elementary Remodel

This was a small remodel that seemed like it kept growing each time we finished with the estimate. Most changes were communicated via email for pricing.

Posted in Commercial Construction | Comments Off on Lincoln Elementary Remodel

Thayne Elementary Addition

We provided our cost estimating services throughout design. This project carried a large contingency because it was in a small, isolated town. Final bid ended up within 8% of budget.  

Posted in Uncategorized | Comments Off on Thayne Elementary Addition

Southeast High School Remodel

8This was an interior remodel and VOAG remodel addition. The trickiest part with the hallway remodel was dealing with some precast columns that had to be replaced.  

Posted in Commercial Construction | Comments Off on Southeast High School Remodel

Southeast Elementary Remodel

Small project involving remodeling the office.

Posted in Commercial Construction | Comments Off on Southeast Elementary Remodel

South Gillette High School Preliminary RFP Schedule

We were asked to put together a critical path schedule as part of a proposal for this project.

Posted in Commercial Construction | Comments Off on South Gillette High School Preliminary RFP Schedule